hr@vistrainspection.com+91 XXXXX XXXXXMon–Sat 9:00–18:30 · 24×7 shutdown support
Registration FREE for freelancers, clients & collaborators
Vistra Inspection Services and Consultants

Pre-Dispatch Inspection and AQL Sampling Made Simple

How AQL sampling to ISO 2859-1 works for pre-dispatch inspection of components and what a PDI report should contain.

2026-11-11 · Inspection · Vistra Inspection Services and Consultants

For high-volume parts it is not practical to inspect every piece. Acceptance sampling to ISO 2859-1 (AQL) decides how many pieces to check and how many defects are acceptable.

Key terms

  • Lot size – the number of pieces offered
  • Inspection level – usually General Level II
  • AQL – the acceptable quality limit, for example 0.65 for major defects and 2.5 for minor
  • Ac/Re – the accept and reject numbers for the sample

What a good PDI report contains

  • Order and lot details and the sampling plan used
  • Dimensional results for critical characteristics
  • Visual, functional and packing checks with photographs
  • A clear pass, fail or hold decision

Vistra's pre-dispatch inspection service is available in every manufacturing cluster in India.

Need help? Request an inspection quote or register free to connect with inspectors near you.
All 36 States & UTs780 districts covered
Qualified inspectorsASNT / ISO 9712 Level II & III
Reports in 24 hoursPhoto-backed, code-referenced
Secure paymentsUPI · Cards · Net banking
Install the Vistra appFaster access to inspectors & requirements